 |
|
| Time : |
2 : 0 |
|
|
Brendan Gregg from Sun's Fishworks team makes an interesting discovery about inducing disk latency. For more details, see Brendan's blog entry: http://blogs.sun.com/brendan/entry/unusual_disk_latency |
|
 |
|
| Time : |
7 : 44 |
|
|
Take a tour of Fusepoint Managed Services high availability data centre |
|
 |
|
| Time : |
2 : 19 |
|
|
Think you need a super-hero to battle high energy costs and overcrowding in your data center?
IBM has green solutions to save the day.
www.ibm.com/systems/greendatacenterman |
|
 |
|
| Time : |
5 : 1 |
|
|
Data Center Australia - Macquarie Hosting has the most accredited Data Center in Australia for the hosting of mission critical applications, dedicated servers and dedicated hosting. Video tour of Data Centre. |
|
 |
|
| Time : |
4 : 6 |
|
|
DataSphere Design and Build Data Centre |
|
 |
|
| Time : |
5 : 14 |
|
|
http://www.pcbistro.com This is my home server/data center setup. This is in the enclosed patio backroom next to my bedroom. It gets really hot really fast so I have air conditioner and a high powered RPM fan blowing 24/7.
The first server:
Compaq Proliant 7000
Quad CPU P3 @ 500MHz
3.8GB RAM
120GB RAID 5 Hard Drives
Dual 10/100 Nic
3 Redundant Power Supplies
Windows Server 2003
Symantec Backup Exec 11.d and SQL Database Server
Dell Power Vault 120T w/Robotic Library
Second server:
Compaq 1850R
Dual P3 500MHz
1GB Ram
3 36GB 10Krpms Hard Drives
18GB 15K Hard Drive
Windows 2003 Server
Domain Controller, Global Catalog
RIS Server
DNS, DHCP
Windows Update Server
SQL Desktop Engine
DFS
Dual Power Supplies
Third computer:
HP Netserver LPr
P3 450MHz
512MB Ram
3 36GB 10Krpms Hard Drives
Two 18GB 15K Hard Drives
Windows 2003 Server
Second Domain Controller
DFS
Fourth server:
Compaq Proliant 7000
Dual CPU P3 @ 400MHz
1.2GB RAM
36GB RAID 5 Hard Drive
Dual 10/100 Nic
3 Redundant Power Supplies
Vmware ESX 2.5.2 Server Hosting 16 Virtual Servers
Test Network w/ VLANS
Fifth server:
Compaq Deskpro EN
One CPU P3 @ 866MHz
512MB RAM
15GB Hard Drive
Gig Enternet
Symantec Client Security w/Firewall and Reporting
RCN Cable/Phone/Internet w/Static IP:
20,000 down/2000 up. On Average 18,000 down /1960 up- Very reliable, never had any major problems or outages that were RCN's fault. Very pleased with the service. (more) (less) |
|
 |
|
| Time : |
2 : 7 |
|
|
By Automating the deployment of SW, applications and middleware the IBM lab in Bobligen, Germany achieved substantial savings in time and resources. |
|
 |
|
| Time : |
5 : 16 |
|
|
Workstation: AMD Sempron 3000+ 2.0Ghz, 1GB DDR, GeForce 4 Ti 4600, 200GB hdd, Running on Windows XP Home. 19"
Laptop Workstation: AMD Mobile x2 Dual Core 1.8Ghz, 4GB DDR3, GeForce-something, 400GB hdd, Running on Windows Vista.
MainServer:(Fileserver and some other apps) AMD Athlon 64 X2 Dual Core Processor 4200+, 4GB DDR2, 3.2TB hdd, GeForce 9700GS. Running on Windows Server 2003.
Webserver: P4 Intel 2.8Ghz, 1GB DDR, 200GB hdd, GeForce 4-MX, Running on Windows Server 2003.
Mailserver(Gateway): P4 Intel 2.4Ghz, 1GB DDR, 120GB hdd, GeForce 2, Running on Unix based FreeBSD 7.0-RELEASE
Allaround: P4 Intel 1.6Ghz, 768SD, 80GB hdd, ATI Radeon 9700PRO, Running on Linux based system CentOS 5.2-RELEASE
Xbox 360: CD/DVD, 3 IBM PowerPC-based CPUs at at 3.2 GHz each bitars CPU, 512.0 MB RAM, DVD, 20GB hdd
Router: Atalanta Science CISCO, 10/100/1000 - 300Mbps Wireless
Switch: NetGEAR FS105, 10/100. 5 ports
KVM: Equip SW 0206C, 2 ports
Connection: 10/10Mbit
This information is a little out-of-date. |
|
 |
|
| Time : |
9 : 58 |
|
|
This homebrew project is to create a datacenter-in-a-box for a fully redundant home data media management system, using Windows Home Server and Vista to serve media via XBox 360 extenders to different rooms. The goal was to fit the hardware to run both systems in as small and aesthetically pleasing a form factor as possible- pretty pleased with the way this turned out, let me know what you think!
Before embarking on this I did some pretty extensive experiments with virtualization- Home Server under Vista, Vista under Home Server etc... my conclusion was that both systems really need access to the raw hardware to perform best, which is why I settled on the two-motherboard solution. For next steps I'm looking at booting Vista from flash memory so as to free up a hard drive slot, and replacing the ATX power supplies with micro-ATX ones to free up more space. Suggestions welcome. |
|
 |
|
| Time : |
3 : 21 |
|
|
Stacey Higginbotham interviews Wade Vinson, 9/26/08 |
|
|
 |
|
| Time : |
1 : 11 |
|
|
The virtual data center is a tailored 3-D replica of servers, racks, networking, power and cooling equipment that allows data center managers to experience real-time enhanced awareness of their dispersed resources |
|
 |
|
| Time : |
3 : 12 |
|
|
When you move your data center there is a lot at stake no one wants to get the Data Center Move Blues.
With ASG Datacenter Relocation Services, our customers could be moving across town, across the country, to a brand-new facility, or to an
existing co-location—Advanced Systems Group (ASG) can safely and efficiently move your data center anywhere it needs to go.
Data center relocations are sometimes required as a result of mergers, acquisitions and disaster recovery requirements. Other times, companies
seek data center relocations to consolidate their resources, virtualize their IT environments and reduce, not only their hardware needs, but
also limit their power and cooling costs. As a result, data center moves are becoming increasingly more necessary and frequent.
All ASG relocation services include proven methodology and detailed documentation to create comprehensive plans to relocate production data
centers from one location to another without endangering any data or critical services.
ASG has the technical experts who focus on protecting your data and equipment. Our engineers are thoroughly trained to plan for contingencies
and potential problems in order to minimize risk.
ASG, the Denver-based IT Consulting, Integration, and Project Management firm, has completed numerous successful data center relocations of
IBM, HP, Sun, EMC, HDS, Cisco and NetApp environments. In addition to its data center relocation services, ASG also provides complete
Information Technology (IT) solutions including comprehensive consulting services, storage and data management solutions, assessments and
implementation services. As part of all its services, ASG focuses on customer needs, customizing unique solutions for companies to successfully
address their particular IT challenges. |
|
 |
|
| Time : |
3 : 32 |
|
|
Just an quick look behind www.trpcomputers.co.uk Excuse the mess im rather busy at the mo!
My Internet connection is 24mb down and 2.5 up with 16 static ips and ptr records! Also have backup isp on seperate line runing 8mb down 756k up.
Also i didnt show you the other roon that houses the apc UPS's and lots of other computer googies! |
|
 |
|
| Time : |
7 : 15 |
|
|
*A fixed point wireless provider we use and love
* Streaming at the speed of light
* Data centers explosive growth |
|
 |
|
| Time : |
3 : 9 |
|
|
This video highlights IBM Mobile Measurement Technology, a cart-based collection and analysis system, which is used by IBM to analyze energy and cooling utilization in data centers. This technology can collect literally hundreds of thousands of temperature and humidity datapoints to help guide decisions to remediate issues.
Questions or want more information? Send a note to datacntr@us.ibm.com. |
|
 |
|
| Time : |
0 : 26 |
|
|
http://theraisedfloor.typepad.com/ |
|
 |
|
| Time : |
9 : 22 |
|
|
Microsoft recently announced that it will park more than 150 shipping containers filled with servers in its huge new data center in Chicago. Microsoft Director of Data Center Research Daniel Costello provided a detailed look at Microsoft's plans for its CBlox data center containers during the GigaOm Structure 08 conference in San Francisco on June 25. For more information about data center containers, visit the Data Center Knowledge web site at datacenterknowledge.com |
|
 |
|
| Time : |
1 : 12 |
|
|
Called "Project Big Green," IBM is announcing new technologies and services to sharply reduce data center energy consumption and its impact on the environment. Using new approaches, IBM expects to double the computing capacity of its data centers within the next three years without increasing power consumption or carbon footprint. IBM is also providing expected energy savings of 42 percent to its clients, the equivalent of removing the emissions of more than 1300 automobiles off the road. IBM Allocates $1 Billion to "Green" Technology and Services to Combat Data Center Energy Crisis [Source: IBM ] |
|
 |
|
| Time : |
4 : 46 |
|
|
It was the last work day before Christmas and I put this one together in my lunch hour. My boys(http://mytriplets.net/) were having PJ day at school and I wore mine also. |
|
 |
|
| Time : |
2 : 25 |
|
|
Marton Olsen from Active Power gives a brief demonstration of the company's flywheel UPS system at the Data Center World expo in Las Vegas on April 1, 2008. |
|
 |
|
| Time : |
3 : 30 |
|
|
Working together, IBM and Eaton offer a truly comprehensive view of the data center environment to help companies make strategic decisions on energy usage, service levels and workload throughput in the data center. - Dr. Kenneth Uhlman, Director, Data Center Business Development, Eaton Corporation |
|
 |
|
| Time : |
5 : 11 |
|
|
SearchDataCenter.com takes a tour of The Planet, a Web hosting company. |
|
 |
|
| Time : |
8 : 33 |
|
|
SearchDataCenter.com takes a tour of the Chicago data center of Equinix, a large data center colocation company |
|
 |
|
| Time : |
8 : 46 |
|
|
日本セキュリティマネジメント学会第22回全国大会懇親会での初演 |
|
 |
|
| Time : |
3 : 53 |
|
|
PORTABLE MODULAR DATA CENTER |
|
 |
|
| Time : |
7 : 47 |
|
|
This is a video tour of the Liquid Web Data Centers. The tour covers Liquid Web Heroic Support, proactive monitoring, security systems, power systems, environmental processing systems and premium tier1 bandwidth.
Liquid Web is located in Lansing Michigan with Several wholly owned data centers. Established in 1997. http://www.liquidweb.com |
|
 |
|
| Time : |
3 : 57 |
|
|
Oracle At Work: Tour Oracle's Austin Data Center with Oracle On Demand SVP, Mike Beck |
|
 |
|
| Time : |
1 : 23 |
|
|
This is the construction of Liquid Web's new 90,000 sq/ft data center in Lansing Michigan. In this video you'll see the mezzanine flooring poured, the elevator completed, drywall being delivered and the data center wall construction begin. Near the end you'll notice the beginnings of our dry pipe pre-action |
|
 |
|
| Time : |
4 : 29 |
|
|
John Heald explores Carnival's Data Center in Miami. |
|
 |
|
| Time : |
3 : 43 |
|
|
Learn how data center virtualization can benefit your business |
|
 |
|
| Time : |
4 : 19 |
|
|
CRG West has opened a new data center at 32 Avenue of the Americas, a historic telecom hub in New York City. In this video, CRG West's David Dunn and Joseph Kiaer provide a tour of the new 50,000 square foot facility, which will provide colocation and meet-me room interconnection services to data center customers in Manhattan. |
|
 |
|
| Time : |
8 : 56 |
|
|
First:
AMD Sempron 1800 MHz
2GB DDR RAM
2x 500GB SATA (Storage)
1x 120GB PATA (System)
ATI Radeon 9550 256MB RAM
Second:
Intel Celeron 400MHz
320MB SD-RAM (2x128MB + 1x64MB)
Unknown ISA GPU
1x80GB PATA (System)
Third:
Intel Celeron 700MHz
2x128MB SD-RAM
2x160GB PATA + 1x120GB PATA (RAID5 System+Storage+Backup(needs rearranging))
Fourth:
Intel Celeron 633MHz
2x64MB SD-RAM
1x20GB PATA (System)
SiS GPU (Unknown specs)
Fifth:
24P 19" 1U HP Managed switch
Sixth:
24P 19" 1U Switch
Seventh:
CNet CWA-854 54G WiFi Node
Eighth:
8P Compaq 19" 1U KVM switch
Ninth:
Asus EEE PC900
900MHz Intel Celeron Mobile
1GB RAM
16GB 2'5" SSD SATA (System)
8GB SDHC (Storage)
Tenth:
IBM Thinkpad 600
266MHz Intel Pentium 2
192MB sd(?)-ram
100GB 2'5" PATA (System+Storage)
Eleventh:
Acer Emachines E510
2GB Intel Celeron Mobile
2GB DDR2 RAM
160GB 2'5" SATA (System)
The rest is decommissioned.. |
|
 |
|
| Time : |
8 : 28 |
|
|
We recently got a tour of the HP POD (Performance Optimized Datacenter), which is HP's entry in the data center container market. HP's Steve Cumings provides a tour of container and some of its features, including the ability to maintain the cold aisle temperature at up to 90 degrees, much warmer than the 68 to 72 degrees seen in traditional data centers. The POD features taller 50U racks to separate and contain the hot and cold aisles. |
|
 |
|
| Time : |
1 : 51 |
|
|
Are their any geek (geek tech, not geek dork) girls out there on youtube? |
|
 |
|
| Time : |
5 : 25 |
|
|
Chris Strandt talks with Travis Stoliker about the ongoing construction of Liquid Web's Data Center 3 in Lansing, MI. This project is scheduled to be complete by February 2009. |
|
 |
|
| Time : |
0 : 50 |
|
|
Colocation America's Data Center Space features high power and high cooling capacity for hosting companies and CDNs. Their dedicated servers are known for its consistent reliability and high speed internet connection. http://www.colocationamerica.com
Founded in 2000 in Los Angeles, California and later incorporated under Colocation America Corporation with corporate office in Las Vegas , Nevada and Datacenters in Los Angeles, California and Las Vegas, Nevada by Sr. System Engineers and Sr. Network Engineers looking to provide the highest possible quality service with knowledgeable staff at lowest possible pricing.
The lack of a good service provider with all the qualities that are now available through Corp America Corporation was the primary motivation behind the group. Currently Colocation America Corporation employs the highest quality equipment and is staffed by the most qualified people in their field. Every team member has a minimum of five years of experience and is certified in their field.
The primary Datacenter located on the world famous "One Wilshire" building in downtown Los Angeles, California allows for maximum scalability as major fiber carriers run directly down what is known as the "Wilshire Corridor" allowing us to easily connect to virtually any backbone provider and scale our internet connectivity to meet clients needs. Additionally our Network is directly connected via Fiber Optic lines to the meet-me-room of the "One Wilshire" building allowing direct access to over 240 bandwidth providers in the word.
In addition to services provided at its own facilities Colocation America Corporation also provides managed services to other providers, currently Colocation America Corporation is under contract and provides network management for several small to mid-size service providers in the United States.
Colocation America Corporation is committed to providing the highest level of support and quality services which include;
- Co-location
- Dedicated Servers
- Shared Hosting
- Web Development
- Bandwidth and IP Services
- Virtual Private Networks Managed Services
Colocation America Corporation's IP Services allow clients direct or managed connections to majority of backbone providers including Savvis, Level3, AboveNet and Wiltel at any of the providers point of presence at substantial discounts. The aggressive pricing is achieved by leveraging the large commitment by current clients to such providers and strategic partnerships with large volume resellers.
Managed Services provide clients with a complete and low cost solution to the complex world of network management, Colocation America Corporation's Managed Services is the only one of its kind with the client's corporate interest in mind and fully branded. Processes such as IP acquisitions, equipment, bandwidth purchases and client contacts are performed with the client's corporate name and are maintained under the client's ownership. Increasing capabilities and reliability of services offered by clients at a fraction of the cost makes Colocation America Corporation's Managed Services ideal for small to mid-size providers.
Colocation America Corporation can provide you with all the resources and services required to ensure your success, contact us for more information on how we can increase quality of services at an attractive bottom line with Complete and Effective Solutions Custom Designed to deliver maximum results from your budget.
FOR MORE INFORMATION VISIT http://www.colocationamerica.com
--or--
1-800-296-8915
--or--
send them a email at support@colocationamerica.com |
|
 |
|
| Time : |
2 : 36 |
|
|
(KCCI 8 Des Moines) Iowa Governor Chet Culver and Google Inc. announced plans for the company to open a data center in Council Bluffs, Iowa, at a press conference on June 19, 2007. Google Inc. is investing $600 million and will eventually create 200 jobs at the facility powering the company's services. For more information, visit www.google.com/councilbluffs. |
|
 |
|
| Time : |
6 : 38 |
|
|
Wolfe's Den blogger Alex Wolfe chats with AMD vice president Kevin Knox about quad-core servers, power and cooling considerations, virtualization, and getting the most data-center bang for your buck. |
|
 |
|
| Time : |
5 : 53 |
|
|
From SearchDataCenter.com: Michael Manos, Senior Director of Data Center Services from Microsoft talks about its data center power management tool, Scry. |
|
 |
|
| Time : |
2 : 15 |
|
|
IBM advertisment about lost control on the data center. |
|
 |
|
| Time : |
4 : 15 |
|
|
Director of Infrastructure, Chris Strandt, discusses the construction of Liquid Web's Data Center 3 in Lansing, Michigan. This data center construction is in Phase 1 and this is the first update video. We will have more later as the construction progresses. |
|
 |
|
| Time : |
2 : 53 |
|
|
http://www.hostedftp.com
http://www.cloudtechie.com
Microsoft has unveiled a cloud computing service, in which data and applications will not be stored on individuals' computers.
The new platform, dubbed Windows Azure, was announced at Microsoft's Professional Developers Conference in Los Angeles.
The platform was described by Microsoft's chief software architect Ray Ozzie as "Windows for the cloud".
The framework will be offered alongside the next Windows release, Windows 7.
The move sees Microsoft taking on established players like Google and Amazon in the rapidly growing business of online software.
The aim is to allow developers to build new applications which will live on the internet, rather than on their own computers.
Microsoft believes consumers will also want to store far more of their data - from letters to photos to videos - on the servers in its "cloud" of giant data centres around the world, so that it can be accessed anywhere, from any device.
http://news.bbc.co.uk/2/hi/technology/7693993.stm |
|
 |
|
| Time : |
2 : 57 |
|
|
A Associação Coimbra Região Digital inaugurou o Data Center Regional no Complexo Tecnológico do Loreto, em Coimbra. Na cerimónia realizou-se a entrega dos prémios aos participantes das diversas iniciativas da Associação, onde se inclui o Prémio Coimbra Digital Inovação Excelência, atribuído a dois licenciados pela Escola Superior de Educação de Coimbra. |
|
 |
|
| Time : |
57 : 0 |
|
|
Data Center Colocation Pre-Soicitation Conference |
|
 |
|
| Time : |
3 : 39 |
|
|
Doug Gourlay, senior director, Data Center Solutions at Cisco and Mark Seery, vice president of Switching Routing at Ovum RHK, discuss data center trends at Interop 2008. These include consolidation, Fiber Channel over Ethernet (FCoE), SFP+, Twinax cabling, and new products. |
|
 |
|
| Time : |
6 : 2 |
|
|
Dean Nelson, Sr. Director of Global Data Center Design Services shows off the newly renovated and energy efficient Sun Microsystems data center on its Santa Clara Campus. |
|
 |
|
| Time : |
9 : 16 |
|
|
Switch Communications built the world's highest density data center ever built. 6 data center zones with 47,000 sq feet each or the size of 10 football fields under one roof. Switch turned to Schneider Electric for its implementation in this case study. |
|
 |
|
| Time : |
7 : 54 |
|
|
Brently Davis, Intel IT Data Center Efficiency Communications Manager, discusses how Intel is consolidating down to 8 global data center hubs through the use of consolidation, virtualization and standardization. The initiative is expected to save Intel $1.8B by project completion. View my blog on this subject http://communities.intel.com/openport/blogs/datacenter/2007/10/30/intel-it-data-center-efficiency-initiative-going-green. |
|
 |
|
| Time : |
7 : 30 |
|
|
A tour of the NAP of the Capital Region, an ultra-secure data center built by Terremark Worldwide in Culpeper, Virginia (60 miles south of Washington, D.C.). Terremark's Norm Laudermilch provides a tour of the $250 million facility's massive infrastructure, which currently includes 11 huge diesel generators and 110 flywheel UPS units. |
|
 |
|
| Time : |
0 : 32 |
|
|
man, it's loud in here!
http://theraisedfloor.typepad.com/ |
|
 |
|
| Time : |
4 : 35 |
|
|
Emerson Network Power India presents - Optimize IT - An Adaptive Data Center Configurator. You can Design IT your self your IT infrastructure in few clicks. |
|
 |
|
| Time : |
9 : 31 |
|
|
Dean Nelson, Sr. Director of Global Data Center Design Services takes journalists through Sun's recently renovated data center on its Santa Clara campus. |
|
 |
|
| Time : |
2 : 32 |
|
|
nwiNetworks is proud to offer Web Hosting, Virtual Private Servers, Dedicated Servers, Shared Servers, and Colocation Services at our Newington, Connecticut Data Center. |
|
 |
|
| Time : |
2 : 22 |
|
|
Andrew Fanara of the Environmental Protection Agency talks about the Energy Star survey, calling on data center managers to measure energy use. |
|
 |
|
| Time : |
8 : 31 |
|
|
"Enabling and Exploiting Server Virtualization in the Data Center" discusses the advantages and challenges of virtualization with Symantec™ software vis-a-vis VMWare™ and other virtualization platforms. |
|
 |
|